Site Prep & Excavation
Every build starts with the ground. TMR clears it, digs it, runs the utilities, and gets it graded and compacted — so whatever goes on top has something solid to sit on.
Groundwork done right the first time
TMR self-performs earthwork with its own crews and equipment — building pads that drain, base compacted to hold, and utilities trenched and inspected before anything gets covered. Getting the dirt phase right keeps the rest of the project on schedule.
On the job





Jobs we've delivered
A few site projects completed for owners and general contractors across Central Texas.
Clarity Eye Center
Cleared, grubbed and striped 28,275 sq ft, then excavated a 1,275 sq ft building pad and installed fill, base and grading.
Bunker Ranch
Clearing, earthwork, wet and dry utilities installation, and base installation for a subdivision.
Twenty Texans — Poco Loco, Bastrop
Prepared the foundation earthwork for concrete paving.